Sling & Rigging Hardware Inspection

Slings and hardware must be inspected by a competent person before each shift or use, and taken out of service when damaged. Every sling must have a legible tag showing its rated capacity.

Photo: examples of damaged slings: birdcaged wire rope, cut synthetic sling, stretched chain link

Inspection schedule

InspectionWhenRecords
InitialNew or repaired slings, before first useRecommended
Frequent (pre-use)Before each shift or each use, by a competent personNot usually required
PeriodicAt least yearly (more often for heavy or harsh use), by a qualified personRequired for some sling types; keep them for all

All slings

Wire rope slings: remove if

Alloy chain slings: remove if

Synthetic web and round slings: remove if

Hardware

Eyebolts and other hardware

Storing slings

Damaged rigging must be removed from service immediately. Tag it and cut or destroy it so it can’t be used by mistake. Never repair slings on site.

Video: sling inspection walkthrough

Standards & references

Last updated: