Soil Nailing & Shotcrete Walls

In soil nailing, steel bars are drilled and grouted into the soil as an excavation is dug from the top down. Shotcrete (sprayed concrete) is then applied to the face. Workers spend their day next to an open vertical cut, so the face must be watched and the sequence followed carefully.

How it works

  1. Excavate a short lift, typically a few feet, and expose a vertical face.
  2. Drill holes into the soil and insert steel bars (nails).
  3. Grout the nails and place mesh or rebar.
  4. Spray shotcrete onto the face. Repeat for the next lift down.

An engineer designs the wall. Work must follow that design and sequence, as required for protective systems. See Protective Systems.

Hazards

Safe practices

Standards & references