Pre-Task Planning

A pre-task plan is a short crew huddle before work starts: what are we doing, what could go wrong, and how will we prevent it? It takes five to fifteen minutes and catches problems when they are still easy to fix.

Why it works

Steps

  1. Describe the task and who does what. Include the sequence.
  2. Identify hazards: falls, struck-by, caught-in, electrical, hot work, chemicals, pinch points, overhead work, traffic, weather and other trades nearby.
  3. Choose controls: eliminate or substitute where possible, then use guards, barriers, lockout, fall protection, PPE, spotters and procedures.
  4. Check permits and equipment: hot work, confined space, lift plans, inspections, tags and training.
  5. Assign roles: competent person, spotter, signal person, fire watch, first aider.
  6. Review emergency actions: where the first aid kit is, exits, assembly point, how to call for help and give the location.
  7. Everyone signs or acknowledges, and understands they can stop work if conditions change.

Tips for good plans

Quick template

Standards & references