Toolbox Talk: Lockout/Tagout
Shut it off, lock it, tag it, release stored energy and verify before servicing any machine.
- Toolbox Talk
- General Industry
- Construction
Prints on one Letter-size page with a sign-in sheet.
Lockout/Tagout
Why it matters
Machines that start up or release stored energy during service kill and maim workers. Lockout/tagout prevents that.
Talking points
- Know the energy: electrical, hydraulic, pneumatic, mechanical, thermal and gravity can all hurt you.
- Shut down and isolate: turn off the machine, then open the disconnect, close valves and block moving parts.
- Lock and tag: put your own lock and tag on every energy-isolating device. Your lock, your key.
- Release stored energy: bleed pressure, discharge capacitors, block raised parts and release springs.
- Verify: try to start the machine, and test with a meter where needed, to prove the energy is off. Then return controls to off.
- Removal: only the person who put on a lock may remove it. Never bypass or cut off someone else's lock.
Ask the crew
- What energy sources does this machine have?
- Where are the isolation points, and who has the locks?
- What do we do if a lock owner isn't here at the end of the shift?
Before we start work today: Confirm everyone who will touch the machine has their own lock and tag and knows the procedure.
Who attended
| # | Name (print) | Signature | Company / crew |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 |
Source: OSHA 1910.147: Control of hazardous energy. General safety information only, not legal advice; follow your employer’s program, the manufacturer’s instructions and current regulations. Keep signed sheets with your safety records. FirstDayTraining.com · Todd Allyn Media Inc.