Crane Setup, Outriggers & Mats
A crane is only as stable as the ground under it. Outrigger pads that punch through soft soil, sink into a buried void or sit on a pavement edge cause many crane tip-overs. Good setup happens before the first lift.
- Crane operators
- Controlling contractors
- Riggers
Photo: mobile crane with outriggers fully extended onto large crane mats, swing radius barricaded with tape and cones
Ground conditions
- OSHA requires the ground to be firm, drained and graded enough that, with mats or blocking, it meets the crane maker’s requirements for support and level.
- The controlling contractor must make sure ground preparations are done and must tell the crane user about known hazards under the surface: voids, tanks, utilities, vaults and recent fill.
- Rain, thawing and nearby excavations can change the ground during the job. Re-check it.
Outriggers and mats
- Extend outriggers exactly as the load chart you’re using requires (fully, mid or retracted), with the crane’s position sensors set to match.
- Use mats or pads sized to spread the outrigger load so the ground bearing pressure stays below what the soil can take. A qualified person can calculate this.
- Center the outrigger float on the mat, and place mats on level, compacted ground.
- Lift the tires off the ground when the chart requires it.
- Level the crane within the maker’s limit, often about 1%. A small tilt can greatly reduce capacity.
Stay back from
- Excavations, trenches and retaining walls
- Underground utilities, vaults, manholes and septic tanks
- Basement walls and slab edges
- Recently backfilled or saturated areas
- Overhead power lines. See Overhead Power Lines
Control the work area
- Barricade the swing radius of the counterweight so no one can be crushed between it and another object.
- Keep people out from under the load and boom.
- Plan traffic so vehicles don’t drive near outriggers.
Setup checklist
- Ground information from the controlling contractor reviewed
- Mats sized and placed; outriggers set as the chart requires
- Crane level within the maker’s limit
- LMI set for the actual configuration
- Swing radius barricaded
- Power lines identified and clearance planned
- Shift inspection done. See Crane Inspections
Standards & references
- 29 CFR 1926.1402: Ground conditions
- 29 CFR 1926.1424: Work area control
- See also: Reading a Crane Load Chart · Crane Safety Basics
Last updated: