Estimating Load Weight

Every safe lift starts with one number: how much the load weighs. Overloading a crane, hoist or sling usually happens because someone guessed. If you can’t find the weight, you have to calculate it, and if you can’t do either with confidence, don’t lift.

Find the weight first

Double-check documents against what you see. Papers can be wrong or list net weight without packaging.

Calculate it: volume × unit weight

Find the volume in cubic feet (length × width × height, all in feet), then multiply by the material’s weight per cubic foot.

MaterialApproximate weight
Steel490 lb per cubic foot
Concrete (reinforced)150 lb per cubic foot
Aluminumabout 170 lb per cubic foot
Water62.4 lb per cubic foot (8.34 lb per gallon)
Soil, sand and gravelabout 100 to 130 lb per cubic foot, more when wet
Wood (lumber)about 30 to 50 lb per cubic foot, depending on species and moisture

Use the higher number when you’re unsure. Rigging handbooks and supplier charts list many more materials.

Examples

See Basic Construction Math.

Don’t forget

Center of gravity

The center of gravity is the balance point. If the hook isn’t directly over it, the load will tilt or swing when it lifts. Machinery, engines and tanks with contents often have an off-center balance point, sometimes marked on the equipment. Lift a few inches first to check balance. See Rigging Basics.

When you don’t know

Critical lifts, like those near a crane’s capacity, need a written plan with a verified weight. See Lift Planning.

Standards & references

Last updated: