Radio & Voice Signals for Crane Lifts

When the operator can’t see the signal person, as on blind lifts, tall buildings and tower cranes, radios carry the signals. Clear, agreed-upon voice commands on a dedicated channel keep loads under control. Garbled or crossed radio traffic causes accidents.

Photo: signal person on a roof with a radio headset guiding a tower crane load the operator can’t see

Radio requirements

Before the lift: agree on the signals

The operator, the signal person and the lift supervisor must meet before the lift and agree on the voice signals they’ll use. Use the same words every time.

How to give a voice command

Each voice signal should contain these parts, in this order:

  1. Function: what to move (hoist, boom, swing, travel)
  2. Direction: up, down, left, right, in, out
  3. Distance and/or speed: “10 feet,” “slow”
  4. Function stop

Example: “Crane 2, swing left… 20 feet… 10… 5… 2… swing stop.”

Good radio practice

If communication is lost, the operator stops. No more crane movement until communication is restored. And anyone can give a stop or emergency stop signal, which the operator must obey.

Back-up plan

Standards & references

Last updated: