Tower Cranes

Tower cranes stand over high-rise and large commercial sites for months. The most dangerous phases are erection, climbing (jumping) and dismantling, and high winds.

Photo: tower crane over a high-rise site with the jib and counter-jib visible

Parts of a tower crane

Key safety points

Inspections

Climbing (jumping) the crane

Raising a tower crane by adding mast sections is one of the riskiest operations on site. The top of the crane is temporarily supported by a climbing frame, and the crane must be balanced and not lifting loads. Follow the manufacturer’s procedure exactly, with a qualified crew, in low wind, and keep everyone not involved out of the area.

Cities and neighbors

Some cities and states license tower crane operators and riggers separately and require permits, engineering reviews and notice before erection. Cranes on neighboring sites may overlap; their operators and contractors must coordinate. Swinging loads over occupied buildings, sidewalks and streets is often restricted.

Working under a tower crane

For the operator

Standards & references