Wire Rope Clips & Wedge Sockets

The end of a wire rope has to be finished with a termination so it can be attached to a hook, a shackle or an anchor. Two common field terminations are U-bolt wire rope clips and wedge sockets. Both work well when installed correctly, and both fail dangerously when they’re installed backward, with too few clips, or not torqued.

Terminations reduce rope strength

U-bolt wire rope clips

A U-bolt clip has a U-shaped bolt and a saddle (the base). Rope is doubled back to form an eye, and clips hold the two parts together.

The golden rule: never saddle a dead horse

How many clips, and how far apart

Installing clips

  1. Turn back the rope the required length (the “turnback”) and use a thimble in the eye to protect the rope from wear and kinking.
  2. Place the first clip one saddle width from the dead end, with the U-bolt on the dead end, and tighten it to the specified torque.
  3. Place the second clip close to the thimble, and tighten it only snug.
  4. Place any middle clips spaced evenly, and take up the slack in the rope before tightening.
  5. Tighten all clips to the specified torque with a torque wrench. Rope diameter and clip size determine torque, so use the maker’s table.
  6. Apply a load gradually and then re-tighten all the clips, because the rope compresses. Re-check after the first few uses and regularly.

Wedge sockets

A wedge socket has a tapered body and a wedge. The rope loops around the wedge, and the load pulls the wedge tight into the socket. It lets you change a rope termination quickly in the field, such as on a crane hoist line.

For cranes, follow the crane maker’s manual and the OSHA crane rules. See Wire Rope, Crane Inspections and Crane Basics.

Inspection and care

Termination checklist

Standards & references

Last updated: