Solar Panel Installation
Solar installers combine roofing hazards with electrical hazards. Solar panels produce electricity whenever light hits them, so you can’t simply “turn them off.”
- Construction
- Electrical
Photo: solar crew on a roof with anchors, lifelines and panels staged
Top hazards
- Falls from roofs and ladders, especially while carrying panels
- DC electrical shock and arc flash; panels are energized in daylight
- Heat on hot roofs, and burns from hot panels and racking
- Wind catching panels like sails
- Attic work: heat, insulation, stepping through ceilings
Key practices
- Use roof anchors and personal fall arrest, or guardrails, on all roof work.
- Hoist panels with ladder lifts or material lifts instead of carrying them up ladders.
- Treat all conductors as energized; cover panels with opaque material when making connections, and test before touching.
- Follow lockout and NEC rapid shutdown procedures; only qualified electrical workers make terminations.
- Plan heat breaks and start early.
- Don’t move panels in high wind.
Why solar DC is tricky
- Panels in series can produce several hundred volts of DC on a sunny day.
- DC arcs don’t self-extinguish the way AC arcs often do, so a loose connection can keep arcing and start a fire.
- Opening the AC disconnect doesn’t de-energize the conductors between the panels and the inverter.
- Battery storage systems add another energized source. See Battery Safety.
Getting panels on the roof
Carrying a panel up a ladder means losing three points of contact while holding something that catches wind. Use a ladder hoist, a material lift or a boom truck. Stage panels on the roof only where they can’t slide or blow off, and never stack them on a steep pitch without securing them.
Roof penetrations and attics
- Locate rafters before drilling, and seal every penetration so the roof doesn’t leak.
- In attics, step only on joists, watch for heat, and keep away from wiring. See HVAC (attic safety).
- Ground-mount systems involve trenching and pile driving. See Trenching.
Before work on an array
- Roof anchors installed and fall protection in use
- Skylights and roof openings protected
- Panel lift or hoist set up
- Rapid shutdown and lockout done; conductors tested
- Panels covered when making connections
- Wind checked; water and shade for heat
Standards & references
- OSHA: Green jobs: solar energy
- NFPA 70 (NEC) Article 690: Solar photovoltaic systems