Paving crews work next to traffic, surrounded by moving pavers, rollers and dump trucks, with hot mix asphalt at around 300°F.

Photo: paving crew behind a paver with a roller and traffic control

Top hazards

Key practices

The paving train

A typical crew works in a moving line: a milling machine removes old pavement, haul trucks deliver mix, a material transfer vehicle may feed the paver, the paver lays the mat, screed operators set thickness, rakers fix edges by hand, and breakdown, intermediate and finish rollers compact the mat. Everyone is close to moving equipment that changes direction constantly.

Who’s at risk

Night paving

Much highway paving happens at night. Drivers are more often tired or impaired, and crews are fatigued. Use Class 3 hi-vis, light the work area without blinding drivers, and keep internal traffic patterns simple. See Night Work.