Fence Installers

Fence work means digging dozens of holes in places you can’t see under, running augers that can twist hard enough to break bones, and handling concrete, wire and heavy panels all day, often next to traffic.

Call 811 before every job

Fence lines follow property lines, the same places utilities often run. Call 811 a few days before digging, wait for the marks, and hand-dig carefully within the tolerance zone (usually 18 to 24 inches on either side of a mark, depending on the state). Remember that private lines, like ones to a garage or sprinkler system, may not be marked. See Call 811 and Utility Strikes.

Post hole augers

When an auger bit hits a root or rock, the machine can twist violently. One-person handheld augers have broken arms and thrown operators.

See Power Augers and Digging Bars & Post Hole Diggers.

Post drivers

Manual and powered post drivers cause crushed hands, shoulder strain and hearing damage. Keep hands on the handles, never on the post top, and wear hearing protection, safety glasses and gloves.

Concrete

Wet concrete is caustic and can cause severe chemical burns that you may not feel until hours later. Wear waterproof gloves and boots, keep it off your skin, and wash right away if it gets through. Bags of concrete mix are heavy, and dry mix makes silica dust. See Corrosives.

Chain link and wire

Lifting and the job site

Before you dig

Standards & references

Last updated: