Crane Assembly & Disassembly
Assembling or taking apart a crane is among the riskiest jobs on a site. Parts are heavy, joints are unstable until finished, and crews work high up. OSHA has a special set of rules for it, and a trained person must be in charge.
- Crane Crews
- Riggers
- Operators
Who is in charge
- An A/D director must run the work. This person is qualified through knowledge, training or experience in the specific crane and process, and understands the procedures (1926.1404).
- The director must review the procedures with the crew before work begins, and make sure the crew knows its tasks and hazards.
- Crew members must understand their role and the hazards of the work.
Following the procedures
- Use the manufacturer's procedures, or an employer procedure developed by a qualified person that provides equal or better safety (1926.1403).
- Do not skip or reorder steps. The order of pin installation and boom sections matters.
- Use the right pins, bolts and fasteners, properly installed and secured. A missing or wrong pin can cause a boom collapse.
- Do not use hardware that is damaged or bent.
Setting up the work
- Level, firm ground with enough bearing; use mats and cribbing as planned. See Crane Setup
- Keep power line clearances, and verify with the line owner. See Cranes & Power Lines
- Block or support boom sections and components so they cannot move or fall while pins are removed or inserted
- Confirm weights of components and use properly rated rigging. See Rigging Basics
- Check that the area is clear of people not involved, and mark it off
- Set up communication between the director, operator and crew with agreed signals
Specific hazards
- Boom section collapse when load shifts onto unsupported pins.
- Crushing between sections, counterweights and the ground.
- Falls from the boom, tower or machine deck. Use fall protection as the rules require. See Personal Fall Arrest Systems.
- Wind that moves long, light components. Stop when wind exceeds the maker's limit.
Danger: Never remove a pin that holds a load. Support first, confirm the load is off the pin, then remove it.